Votes
Recent vote results
Employment Tribunal (Extension of Time Limits) (Miscellaneous Amendments and Transitional Provisions) Regulations 2026
MPs voted on whether to approve the draft Employment Tribunal (Extension of Time Limits) (Miscellaneous Amendments and Transitional Provisions) Regulations 2026.
Party summary for selected division
MPs voted on whether to approve the draft Employment Tribunal (Extension of Time Limits) (Miscellaneous Amendments and Transitional Provisions) Regulations 2026.
The latest division was recorded as motion agreed with 323 Ayes and 107 Noes.
MPs voted on whether to approve the draft Employment Tribunal (Extension of Time Limits) (Miscellaneous Amendments and Transitional Provisions) Regulations 2026.
The latest division was recorded as motion agreed with 323 Ayes and 107 Noes.
The chart above shows how the recorded Ayes and Noes were split across parties.
What happened
MPs voted on whether to approve the draft Employment Tribunal (Extension of Time Limits) (Miscellaneous Amendments and Transitional Provisions) Regulations 2026.
The latest division was recorded as motion agreed with 323 Ayes and 107 Noes.
MP profiles for this division
These lists show current MPs and how Parliament recorded them in this division. Open a group below to view individual profiles. MPs who have since left the House of Commons are not included.
Voted Aye 322
- Adam Jogee
- Adam Thompson
- Adrian Ramsay
- Afzal Khan
- Alan Strickland
- Al Carns
- Alex Baker
- Alex Ballinger
- Alex Davies-Jones
- Alex Mayer
- Alex McIntyre
- Alex Norris
- Alex Sobel
- Alice Macdonald
- Alison McGovern
- Alistair Strathern
- Amanda Hack
- Andrew Cooper
- Andrew Lewin
- Andrew Pakes
- Andrew Ranger
- Andy Burnham
- Andy MacNae
- Andy McDonald
- Andy Slaughter
- Angela Rayner
- Anna Dixon
- Anna Gelderd
- Anna McMorrin
- Anna Turley
- Ann Davies
- Anneliese Dodds
- Anneliese Midgley
- Antonia Bance
- Ashley Dalton
- Baggy Shanker
- Barry Gardiner
- Bell Ribeiro-Addy
- Ben Coleman
- Ben Goldsborough
- Ben Lake
- Blair McDougall
- Bridget Phillipson
- Callum Anderson
- Carla Denyer
- Carolyn Harris
- Cat Eccles
- Catherine McKinnell
- Catherine West
- Cat Smith
- Charlotte Nichols
- Chris Curtis
- Chris Evans
- Chris Hinchliff
- Chris Murray
- Christian Wakeford
- Chris Vince
- Chris Ward
- Chris Webb
- Claire Hazelgrove
- Claire Hughes
- Clive Efford
- Clive Lewis
- Connor Naismith
- Dame Angela Eagle
- Dame Diana Johnson
- Dame Meg Hillier
- Dame Nia Griffith
- Damien Egan
- Dan Carden
- Daniel Francis
- Daniel Zeichner
- Danny Beales
- Dan Tomlinson
- Darren Jones
- Darren Paffey
- Dave Doogan
- Dave Robertson
- David Baines
- David Burton-Sampson
- David Pinto-Duschinsky
- David Taylor
- David Williams
- Dawn Butler
- Debbie Abrahams
- Deirdre Costigan
- Douglas McAllister
- Dr Allison Gardner
- Dr Beccy Cooper
- Dr Ellie Chowns
- Dr Jeevun Sandher
- Dr Lauren Sullivan
- Dr Marie Tidball
- Dr Peter Prinsley
- Dr Rupa Huq
- Dr Scott Arthur
- Dr Simon Opher
- Dr Zubir Ahmed
- Elaine Stewart
- Ellie Reeves
- Emily Darlington
- Emily Thornberry
- Emma Foody
- Emma Hardy
- Emma Lewell
- Emma Reynolds
- Euan Stainbank
- Feryal Clark
- Fleur Anderson
- Frank McNally
- Gareth Snell
- Gareth Thomas
- Gen Kitchen
- Gerald Jones
- Gill German
- Gordon McKee
- Grahame Morris
- Graham Stringer
- Gregor Poynton
- Gurinder Singh Josan
- Hannah Spencer
- Harpreet Uppal
- Helena Dollimore
- Helen Hayes
- Henry Tufnell
- Ian Lavery
- Ian Murray
- Imran Hussain
- Iqbal Mohamed
- Irene Campbell
- Jack Abbott
- Jacob Collier
- Jade Botterill
- James Murray
- James Naish
- Janet Daby
- Jayne Kirkham
- Jeff Smith
- Jen Craft
- Jenny Riddell-Carpenter
- Jeremy Corbyn
- Jess Asato
- Jessica Morden
- Jessica Toale
- Jess Phillips
- Jodie Gosling
- Joe Morris
- Joe Powell
- John Grady
- John Healey
- John McDonnell
- John Slinger
- John Whitby
- Jonathan Davies
- Jonathan Reynolds
- Jon Pearce
- Jon Trickett
- Josh Dean
- Josh Fenton-Glynn
- Josh MacAlister
- Josh Newbury
- Jo Stevens
- Jo White
- Julia Buckley
- Juliet Campbell
- Justin Madders
- Kanishka Narayan
- Karin Smyth
- Kate Dearden
- Kate Osborne
- Katrina Murray
- Keir Mather
- Kenneth Stevenson
- Kerry McCarthy
- Kevin Bonavia
- Kevin McKenna
- Kim Johnson
- Kim Leadbeater
- Kirith Entwistle
- Kirsteen Sullivan
- Kirsty Blackman
- Kirsty McNeill
- Laurence Turner
- Lee Barron
- Lee Pitcher
- Leigh Ingham
- Lewis Atkinson
- Liam Byrne
- Lilian Greenwood
- Lillian Jones
- Linsey Farnsworth
- Lisa Nandy
- Liz Kendall
- Liz Saville Roberts
- Liz Twist
- Llinos Medi
- Lloyd Hatton
- Lola McEvoy
- Louise Sandher-Jones
- Luke Akehurst
- Luke Myer
- Margaret Mullane
- Maria Eagle
- Mark Ferguson
- Mark Sewards
- Markus Campbell-Savours
- Marsha De Cordova
- Martin Rhodes
- Mary Creagh
- Mary Glindon
- Mary Kelly Foy
- Matthew Pennycook
- Matt Rodda
- Matt Turmaine
- Matt Western
- Maureen Burke
- Miatta Fahnbulleh
- Michael Payne
- Michael Shanks
- Michael Wheeler
- Michelle Scrogham
- Mike Kane
- Mike Tapp
- Mohammad Yasin
- Mr Adnan Hussain
- Mr Alex Barros-Curtis
- Mr Bayo Alaba
- Mr Clive Betts
- Mr David Lammy
- Mr Douglas Alexander
- Mr Hamish Falconer
- Mr James Frith
- Mr Jonathan Brash
- Mr Luke Charters
- Mr Paul Foster
- Mrs Elsie Blundell
- Mrs Sharon Hodgson
- Mr Tanmanjeet Singh Dhesi
- Mr Toby Perkins
- Ms Abena Oppong-Asare
- Ms Julie Minns
- Ms Marie Rimmer
- Natalie Fleet
- Naushabah Khan
- Navendu Mishra
- Neil Coyle
- Neil Duncan-Jordan
- Nesil Caliskan
- Nick Smith
- Noah Law
- Oliver Ryan
- Olivia Bailey
- Olivia Blake
- Pam Cox
- Pamela Nash
- Pat McFadden
- Patricia Ferguson
- Patrick Hurley
- Paula Barker
- Paul Davies
- Paul Waugh
- Perran Moon
- Peter Dowd
- Peter Kyle
- Peter Lamb
- Peter Swallow
- Preet Kaur Gill
- Rachael Maskell
- Rachel Blake
- Rachel Hopkins
- Rebecca Long Bailey
- Richard Baker
- Richard Burgon
- Richard Quigley
- Rosie Wrighting
- Ruth Cadbury
- Ruth Jones
- Sadik Al-Hassan
- Sally Jameson
- Samantha Dixon
- Samantha Niblett
- Sam Carling
- Sam Rushworth
- Sarah Champion
- Sarah Coombes
- Sarah Edwards
- Sarah Owen
- Sarah Russell
- Sarah Sackman
- Satvir Kaur
- Sean Woodcock
- Seema Malhotra
- Sir Alan Campbell
- Sir Mark Tami
- Sir Nicholas Dakin
- Sir Stephen Timms
- Siân Berry
- Sojan Joseph
- Sonia Kumar
- Stephanie Peacock
- Stephen Doughty
- Stephen Kinnock
- Steve Reed
- Steve Witherden
- Steve Yemm
- Sureena Brackenridge
- Tahir Ali
- Tim Roca
- Tom Collins
- Tom Rutland
- Tony Vaughan
- Torsten Bell
- Tracy Gilbert
- Tristan Osborne
- Uma Kumaran
- Valerie Vaz
- Vicky Foxcroft
- Warinder Juss
- Wes Streeting
- Yasmin Qureshi
- Yuan Yang
- Zarah Sultana
Voted No 107
- Alan Mak
- Alex Burghart
- Alex Easton
- Alicia Kearns
- Andrew Bowie
- Andrew Griffith
- Ben Obese-Jecty
- Blake Stephenson
- Bradley Thomas
- Carla Lockhart
- Chris Philp
- Claire Coutinho
- Dame Caroline Dinenage
- Dame Harriett Baldwin
- Dame Karen Bradley
- David Mundell
- David Reed
- David Simmonds
- Douglas Lumsden
- Dr Andrew Murrison
- Dr Ben Spencer
- Dr Caroline Johnson
- Dr Kieran Mullan
- Dr Luke Evans
- Dr Neil Hudson
- Dr Neil Shastri-Hurst
- Edward Argar
- Esther McVey
- Gareth Bacon
- Gareth Davies
- George Freeman
- Gregory Stafford
- Greg Smith
- Harriet Cross
- Helen Grant
- Jack Rankin
- James Cartlidge
- James McMurdock
- James Wild
- Jerome Mayhew
- Jesse Norman
- Jim Allister
- Jim Shannon
- Joe Robertson
- John Cooper
- John Glen
- John Lamont
- Joy Morrissey
- Julia Lopez
- Katie Lam
- Kevin Hollinrake
- Kit Malthouse
- Laura Trott
- Lee Anderson
- Lewis Cocking
- Lincoln Jopp
- Mark Garnier
- Mark Pritchard
- Martin Vickers
- Matt Vickers
- Mike Wood
- Mims Davies
- Mr Andrew Snowden
- Mr Gagan Mohindra
- Mr Gregory Campbell
- Mr Mark Francois
- Mr Peter Bedford
- Mrs Kemi Badenoch
- Neil O'Brien
- Nick Timothy
- Nigel Farage
- Nigel Huddleston
- Patrick Spencer
- Paul Holmes
- Peter Fortune
- Priti Patel
- Rebecca Harris
- Rebecca Paul
- Rebecca Smith
- Richard Fuller
- Richard Tice
- Robin Swann
- Sammy Wilson
- Saqib Bhatti
- Sarah Bool
- Sarah Pochin
- Shivani Raja
- Simon Hoare
- Sir Alec Shelbrooke
- Sir Andrew Mitchell
- Sir Ashley Fox
- Sir Bernard Jenkin
- Sir Desmond Swayne
- Sir Gavin Williamson
- Sir Geoffrey Clifton-Brown
- Sir James Cleverly
- Sir Jeremy Hunt
- Sir Jeremy Wright
- Sir John Hayes
- Sir John Whittingdale
- Sir Julian Lewis
- Sir Julian Smith
- Sir Mel Stride
- Sir Oliver Dowden
- Stuart Anderson
- Stuart Andrew
- Wendy Morton
No recorded vote 220
The official division record does not show these MPs as voting Aye or No, or acting as tellers. It does not state the reason.
- Abtisam Mohamed
- Adam Dance
- Alan Gemmell
- Alberto Costa
- Alex Brewer
- Alison Bennett
- Alison Griffiths
- Alison Hume
- Alison Taylor
- Amanda Martin
- Andrew George
- Andrew Rosindell
- Andrew Western
- Anna Sabine
- Aphra Brandreth
- Apsana Begum
- Ayoub Khan
- Bambos Charalambous
- Becky Gittins
- Ben Maguire
- Bill Esterson
- Bob Blackman
- Bobby Dean
- Brendan O'Hara
- Brian Leishman
- Brian Mathew
- Calum Miller
- Cameron Thomas
- Caroline Nokes
- Caroline Voaden
- Catherine Atkinson
- Catherine Fookes
- Charlie Dewhirst
- Charlie Maynard
- Charlotte Cane
- Chris Bloore
- Chris Bryant
- Chris Coghlan
- Chris Elmore
- Chris Hazzard
- Chris Kane
- Chris Law
- Chris McDonald
- Christine Jardine
- Claire Hanna
- Claire Young
- Clive Jones
- Colum Eastwood
- Daisy Cooper
- Dame Chi Onwurah
- Dame Siobhain McDonagh
- Damian Hinds
- Dan Aldridge
- Dan Jarvis
- Dan Norris
- Danny Kruger
- David Chadwick
- David Davis
- David Smith
- Derek Twigg
- Dr Al Pinkerton
- Dr Danny Chambers
- Dr Rosena Allin-Khan
- Dr Roz Savage
- Dáire Hughes
- Ed Davey
- Ed Miliband
- Edward Morello
- Fabian Hamilton
- Florence Eshalomi
- Freddie van Mierlo
- Fred Thomas
- Gavin Robinson
- Georgia Gould
- Gideon Amos
- Gill Furniss
- Graeme Downie
- Graham Leadbitter
- Graham Stuart
- Heidi Alexander
- Helen Maguire
- Helen Morgan
- Helen Whately
- Hilary Benn
- Ian Byrne
- Ian Roome
- Ian Sollom
- Imogen Walker
- Jake Richards
- James Asser
- James MacCleary
- Jamie Stone
- Jas Athwal
- Jess Brown-Fuller
- Jim Dickson
- Jim McMahon
- Joani Reid
- Johanna Baxter
- John Finucane
- John Milne
- Jonathan Hinder
- Jo Platt
- Josh Babarinde
- Judith Cummins
- Karl Turner
- Kate Osamor
- Katie White
- Lara Bird
- Laura Kyrke-Smith
- Lauren Edwards
- Layla Moran
- Liam Conlon
- Lisa Smart
- Liz Jarvis
- Lizzi Collinge
- Lorraine Beavers
- Louise Haigh
- Lucy Powell
- Lucy Rigby
- Luke Murphy
- Luke Pollard
- Luke Taylor
- Manuela Perteghella
- Marie Goldman
- Martin McCluskey
- Martin Wrigley
- Matt Bishop
- Matthew Patrick
- Max Wilkinson
- Maya Ellis
- Melanie Onn
- Melanie Ward
- Michelle Welsh
- Mike Martin
- Mike Reader
- Monica Harding
- Mr Alistair Carmichael
- Mr Angus MacDonald
- Mr Calvin Bailey
- Mr Cathal Mallaghan
- Mr Connor Rand
- Mr Joshua Reynolds
- Mr Lee Dillon
- Mr Louie French
- Mr Paul Kohler
- Mr Richard Holden
- Mr Will Forster
- Ms Diane Abbott
- Ms Nusrat Ghani
- Ms Polly Billington
- Ms Stella Creasy
- Munira Wilson
- Nadia Whittome
- Natasha Irons
- Naz Shah
- Nick Thomas-Symonds
- Olly Glover
- Pat Cullen
- Paulette Hamilton
- Paul Maskey
- Pete Wishart
- Phil Brickell
- Pippa Heylings
- Rachel Gilmour
- Rachel Reeves
- Rachel Taylor
- Richard Foord
- Rishi Sunak
- Robbie Moore
- Robert Jenrick
- Rosie Duffield
- Rupert Lowe
- Rushanara Ali
- Sarah Dyke
- Sarah Gibson
- Sarah Green
- Sarah Hall
- Sarah Jones
- Sarah Olney
- Sarah Smith
- Seamus Logan
- Shabana Mahmood
- Shaun Davies
- Shockat Adam
- Simon Lightwood
- Sir Christopher Chope
- Sir Edward Leigh
- Sir Geoffrey Cox
- Sir Iain Duncan Smith
- Sir Lindsay Hoyle
- Sir Mark Hendrick
- Sir Roger Gale
- Sorcha Eastwood
- Steff Aquarone
- Stephen Morgan
- Steve Barclay
- Steve Darling
- Steve Race
- Suella Braverman
- Susan Murray
- Taiwo Owatemi
- Terry Jermy
- Tessa Munt
- Tim Farron
- Tom Gordon
- Tom Hayes
- Tom Morrison
- Tom Tugendhat
- Tonia Antoniazzi
- Torcuil Crichton
- Tulip Siddiq
- Victoria Atkins
- Victoria Collins
- Vikki Slade
- Wendy Chamberlain
- Wera Hobhouse
- Will Stone
- Yvette Cooper
- Zöe Franklin
- Órfhlaith Begley
Grouped results summary
Divisions in this vote group
Each row below shows the result and Aye/No counts for that individual division.
Sources
Official records used for the vote result and explanation.
